Transbuild Commercial was engaged by Eke Panuku Development Auckland to deliver a new operations depot for Westhaven Marina. The project involved the turnkey design, off-site manufacture, delivery, and installation of two modular office buildings within a live marina environment. Constructed in Transbuild’s Drury factory in as little as 10 weeks, the off-site approach allowed site preparation to progress in parallel and reduced on-site activity within the constrained coastal environment.
Eke Panuku – Westhaven Marina Operations
Project Outcome
Off-Site Manufacturing Approach
Both modular buildings were fully manufactured and completed within Transbuild’s controlled factory environment, including interior fit-out, services, and finishes. Off-site construction enabled civil and site preparation works to progress simultaneously, reduced weather and programme risk, and ensured consistent quality outcomes prior to delivery.
Installation and Delivery Outcome
The completed buildings were transported to Westhaven Marina and installed onto pre-prepared foundations, with Transbuild coordinating cranage, service connections, decking, ramps, and accessibility works as part of the turnkey scope. Installation planning prioritised marina access, protection of a significant existing frangipani tree, and continuity of CCTV and IT systems.
“Delivered within a live coastal marina environment, this project demonstrates Transbuild’s ability to manage consent, logistics, and operational constraints through off‑site construction.”
Turnkey modular delivery in a live coastal environment with minimal disruption
DELIVERABLES
- Two modular office buildings
- Decking, ramps, and accessibility
CLIENT
- Eke Panuku Development Auckland
COMPLETION YEAR
- 2025
DELIVERY MODEL
- Delivery & Cranage within a live coastal marina environment
- On-site installation onto prepared foundations Service connections (power, data, water, wastewater)
Live Marina Environment
Delivered within an active public marina with minimal disruption to operations.
Turnkey Off-Site Buildings
Fast factory-built solution reduced on-site disruption and improved programme certainty.
Handling Site Consents
Designed and delivered within a coastal hazard and marina precinct zone requiring formal resource consent.